Updated: 30/09/2026

Blanca City location — the heart of Bai Sau, Vung Tau

Blanca City has 1 km of Bai Sau beachfront right inside Vung Tau’s established urban core. This page covers the address under the new and old administrative names, travel times, transport links and what is already around the project.

Rendering of Blanca City on Bai Sau beach, Vung Tau (illustration)

Address under the new and old names

ItemDetails
Frontage3/2 Street & the Thuy Van axis, Bai Sau
New administrative area (from 2025)Rach Dua & Phuoc Thang wards, Ho Chi Minh City
Former administrative areaVung Tau city, Ba Ria – Vung Tau province
Planning zoneChi Linh – Cua Lap tourism zone (849 ha)

After the 2025 administrative reorganization, Ba Ria – Vung Tau province was merged into Ho Chi Minh City; the old names are still widely used in searches.

Travel times

DestinationTime (indicative)Notes
Central Ho Chi Minh City~70–90 minutesVia the Bien Hoa – Vung Tau expressway (opened 2026)
Long Thanh International Airport~45 minutesPhase 1 capacity 25 million passengers/year, expected to open Dec 2026
Mekong Delta—Linked via the Ben Luc – Long Thanh expressway

Travel times depend on traffic and infrastructure progress.

The Bai Sau beachfront

The project faces the Thuy Van beach arc directly — Vung Tau’s busiest central beach. Tam Thang square was inaugurated on 2 September 2025 after 75 days of construction and drew 24,000 visitors on opening day.

This is virtually the last beachfront land bank in inner Vung Tau: few projects combine 1 km of coastline with a position inside an established urban core.

Rendering of the seafront square at Blanca City (illustration)

Living in an established urban core

  • Next to 3/2 Street and Le Hong Phong Street — schools, hospitals, markets and full infrastructure.
  • Clean air: an AQI of roughly 30–70.
  • Depending on orientation, Beachtro apartments look out on Sun World & Bai Sau, the inner city & Bai Truoc, Beacon tower or the Paradise golf course.

Visit the project with Happy Land

Happy Land can arrange a visit to the project and the show units in Vung Tau. Message us to book a time.

Frequently asked questions

Which ward is Blanca City in?

It fronts 3/2 Street and Thuy Van on Bai Sau — Rach Dua & Phuoc Thang wards, Ho Chi Minh City (before 2025, Vung Tau city, Ba Ria – Vung Tau province).

How long does it take from Ho Chi Minh City?

About 70–90 minutes via the Bien Hoa – Vung Tau expressway (opened 2026), depending on your starting point and traffic.

How far is Long Thanh airport?

About 45 minutes. Long Thanh phase 1 has a capacity of 25 million passengers a year and is expected to open in December 2026.

Is Blanca City on the beach?

Yes. The project has 1 km of Bai Sau coastline, directly facing the Thuy Van beach arc.

Zalo